
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 6 - Jul 11
For Your Every Summer RSVP, with Code: SUMMER15
Description
An Introduction to Drainage Pipe Strength, Cover and Bedding for Professional EngineersIntroductory technical guidance for civil engineers and other professional engineers and construction managers interested in design and construction of drainage piping systems. Here is what is discussed: 1. INTRODUCTION, 2. SELECTION OF TYPE OF PIPE, 3. SELECTION OF N VALUES, 4. RESTRICTED USE OF BITUMINOUS COATED PIPE, 5. MINIMUM COVER, 6. CLASSES OF BEDDING AND INSTALLATION, 7. STRENGTH OF PIPE, 8. RIGID PIPE, 9. FLEXIBLE PIPE, 1O. BEDDING OF PIPE
Introductory technical guidance for civil engineers and other professional engineers and construction managers interested in design and construction of drainage piping systems. Here is what is discussed: 1. INTRODUCTION, 2. SELECTION OF TYPE OF PIPE, 3. SELECTION OF N VALUES, 4. RESTRICTED USE OF BITUMINOUS-COATED PIPE, 5. MINIMUM COVER, 6. CLASSES OF BEDDING AND INSTALLATION, 7. STRENGTH OF PIPE, 8. RIGID PIPE, 9. FLEXIBLE PIPE, 1O. BEDDING OF PIPE (CULVERTS AND STORM DRAINS).
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy